Week 18: Outdoor ceiling, Pantry and wardrobes' shelves fitted
Outdoor painting started. Ceiling got painted around the house. The alfresco is looking amazing now!!!
Pantry shelves were fitted.
Wardrobes got fitted:
Walk in Robes also got fitted:
And tiles arrived..... next week will be a busy one!!!!
Saturday, 12 October 2013
Tuesday, 1 October 2013
House Interior Painting Finished
Week 17: (House Interior Painting Finished)
Waterproofing coating on bathroom walls:
First sight of our external charcoal feature colour for doors and facade feature wall:
Garage also painted, now just waiting for neighbour to finish building his brick walls, so we can get our render painted:
Waterproofing coating on bathroom walls:
First sight of our external charcoal feature colour for doors and facade feature wall:
Garage also painted, now just waiting for neighbour to finish building his brick walls, so we can get our render painted:
Monday, 30 September 2013
Painting Starts
End of Week 16 (Painting starts):
I was driving pass the house on Friday, when I noticed that the garage door was missing, so I stopped to have a look what was going on. And for my surprise, the house was been painted. Very nice surprise as I was expecting it just to happen on the following week.
I was driving pass the house on Friday, when I noticed that the garage door was missing, so I stopped to have a look what was going on. And for my surprise, the house was been painted. Very nice surprise as I was expecting it just to happen on the following week.
Tuesday, 24 September 2013
Fixing the "Fixing Stage"
Weeks 14/15/16 Fixing the 'Fixing Stage':
For the last 3 weeks a lot has been going on, walls, doors and floors have been getting prepared for painting and tiling...
On the end of week 13, an inspection was carried out at the site, and some minor problems were reported to be fixed before painting and so on....
So, for the last 3 weeks those faults were repaired.
Apart of that, doors were prepared to be painted and the door that connects the garage to the backyard was installed.
For the last 3 weeks a lot has been going on, walls, doors and floors have been getting prepared for painting and tiling...
On the end of week 13, an inspection was carried out at the site, and some minor problems were reported to be fixed before painting and so on....
So, for the last 3 weeks those faults were repaired.
Apart of that, doors were prepared to be painted and the door that connects the garage to the backyard was installed.
Saturday, 7 September 2013
Fixing Stage finished:
Week 13 - House Rendering, Internal Doors, Kitchen & Vanities, Cornices, Architraves & Skirtings (Fixing Stage Finished):
The house render is looking stunning!
We wanted to get that beautiful render look to the entire house, and for that reason we used Hebel. We were a little in doubt but we decided to take a gamble. We researched a lot the material, we visited several Hebel houses and went for it.
But now that the render is ready to be painted, we are really happy with the outcome. Sincerely, the house looks better than we were expecting.
Kitchen & Living getting shaped:
Laundry:
Bathrooms:
The house render is looking stunning!
We wanted to get that beautiful render look to the entire house, and for that reason we used Hebel. We were a little in doubt but we decided to take a gamble. We researched a lot the material, we visited several Hebel houses and went for it.
But now that the render is ready to be painted, we are really happy with the outcome. Sincerely, the house looks better than we were expecting.
Kitchen & Living getting shaped:
Laundry:
Bathrooms: