Week 23: PCI booked, Carpet, Painting and Termite Protection
Façade got a little more painting done, but bad weather is delaying it to be fully painted:
Wrong underlay was changed. Now carpet feels really soft and nice.
Hallway carpet fitted:
Lounge carpet fitted:
Master bedroom carpet fitted:
Ensuite got a couple of spot lights to replace our mirror light that didn't fit in there:
Carpet fitted, Walk-In-Robe (Hers):
And also, carpet fitted on Walk-In-Robe (His):
Termite Protection System fitted:
Showing posts with label Carpet. Show all posts
Showing posts with label Carpet. Show all posts
Friday, 15 November 2013
Saturday, 9 November 2013
Finishing touches
Week 22: Finishing touches!!!
Garage door was fitted, façade started to be painted, temp fences were removed, loo removed and rubbish taken away:
Final 4 corner roof tiles were loose, and this week they were properly affixed.
Side render completely painted:
Garage side door replaced:
Works under the front door:
Toilet fan were fitted:
Garage door from inside:
Painting inspection was carried out. Blue labels means "places to be fixed!"
Carpet started to be fitted but with wrong underlay.... :(
Garage door was fitted, façade started to be painted, temp fences were removed, loo removed and rubbish taken away:
Final 4 corner roof tiles were loose, and this week they were properly affixed.
Side render completely painted:
Garage side door replaced:
Works under the front door:
Toilet fan were fitted:
Garage door from inside:
Painting inspection was carried out. Blue labels means "places to be fixed!"
Carpet started to be fitted but with wrong underlay.... :(
Subscribe to:
Posts (Atom)