Lock Up Stage finished

Week 10:

All cabling done outside, and some minor aesthetic feature:


 Left side completed Hebel view:

Back side completed Hebel view:

Right side completed Hebel view:

Wet areas in floor showers done:


 And also all cabling done inside.
 
 Evaporative cooling system ducts installed.

Heater and ducts installed.


Monday, 5 August 2013

Lock Up stage (cont...)

Week 9:

"Lock Up" stage continues with more Hebel walls placed.

The Hebel in the back of the house is nearly finished, just needing some minor touches here and there.



And one of the sides of the house is also nearly finished, just waiting for minor touches.

While on the other side of the house, Hebel walls are getting screwed into the metal frames.

Saturday, 3 August 2013

Hebel starts

End of Week 8:

House Façade on Saturday:

House Façade on Thursday:

Backyard on Saturday:

Backyard on Thursday:


Wednesday, 31 July 2013

House Wrap

Week 8 (cont...)

House completely wrapped and solar heating installed.



 
 
 

Tuesday, 30 July 2013

Roof

Week 8:

Roof, day 2:


 


Roof, day 1: