Friday, 16 August 2013

Lock Up Stage finished

Week 10:

All cabling done outside, and some minor aesthetic feature:


 Left side completed Hebel view:

Back side completed Hebel view:

Right side completed Hebel view:

Wet areas in floor showers done:


 And also all cabling done inside.
 
 Evaporative cooling system ducts installed.

Heater and ducts installed.