The construction of our home.
A Foxley29 by Porter Davis.
Showing posts with label
Gutter
.
Show all posts
Showing posts with label
Gutter
.
Show all posts
Friday, 26 July 2013
Gutters and Hot & Cold water
End of week 7:
Gutter installed.
Hot and Cold water to toilets and kitchen connected.
Older Posts
Home
Subscribe to:
Posts (Atom)