Showing posts with label Roof. Show all posts
Showing posts with label Roof. Show all posts

Saturday, 9 November 2013

Finishing touches

Week 22: Finishing touches!!!

Garage door was fitted, façade started to be painted, temp fences were removed, loo removed and rubbish taken away:

Final 4 corner roof tiles were loose, and this week they were properly affixed.

Side render completely painted:

Garage side door replaced:

Works under the front door:

Toilet fan were fitted:

Garage door from inside:

Painting inspection was carried out. Blue labels means "places to be fixed!"

Carpet started to be fitted but with wrong underlay.... :(

Wednesday, 31 July 2013

House Wrap

Week 8 (cont...)

House completely wrapped and solar heating installed.



 
 
 

Tuesday, 30 July 2013

Roof

Week 8:

Roof, day 2:


 


Roof, day 1: