Tuesday, 24 September 2013

Fixing the "Fixing Stage"

Weeks 14/15/16 Fixing the 'Fixing Stage':

For the last 3 weeks a lot has been going on, walls, doors and floors have been getting prepared for painting and tiling...
On the end of week 13, an inspection was carried out at the site, and some minor problems were reported to be fixed before painting and so on....
So, for the last 3 weeks those faults were repaired.

Apart of that, doors were prepared to be painted and the door that connects the garage to the backyard was installed.